Question 1 - 10
Write ONE WORD ONLY for each answer.
Engineering for sustainable development
The Greenhouse Project (Himalayan mountain region)
Problem
- Short growing season because of high altitude and low 1.31________
- Fresh vegetables imported by lorry or by 2.32 ________, so are expensive
- Need to use sunlight to prevent local plants from 3.33________
- Previous programmes to provide greenhouses were 4.
New greenhouse
Meets criteria for sustainability
- Simple and to build5.
- Made mainly from local materials (mud or stone for the walls, wood and6. for the roof)
Building and maintenance done by local craftsmen
- Runs solely on 7. energy
- Only families who have a suitable 8. can own one
Design
Long side faces south
Strong polythene cover
- Inner9.40 ________ are painted black or white
Social benefits
Owners’ status is improved
- Rural10. have greater opportunities
More children are educated
. . .